P/N: 4d2037-24
Category: Bearings & Bushings
This product requires a custom quote. Please contact our sales team for pricing information or submit an RFQ (Request for Quote).
| Condition | Stock |
|---|---|
| As Removed | 2 Available |
The 4d2037-24 is a 28-volt pneumatic de-icing system controller that sequences boot inflation and deflation cycles. This timer-based controller manages airframe ice protection by regulating pneumatic pressure to wing and tail leading-edge boots. Used on Embraer EMB-500 (Phenom 100) aircraft and similar platforms requiring automatic de-icing sequencing.
Installation and functional testing must follow the aircraft maintenance manual and verify compatibility with your airframe's Illustrated Parts Catalog. Complies with 14 CFR 23.1419 ice-protection requirements.
Please note: Product descriptions are provided for informational purposes. Always refer to your aircraft's Illustrated Parts Catalog (IPC) to verify part compatibility and specifications.
The 4d2037-24 is a 28-volt pneumatic de-icing system controller that sequences boot inflation and deflation cycles. This timer-based controller manages airframe ice protection by regulating pneumatic pressure to wing and tail leading-edge boots.
Aircraft hardware is manufactured to military and aviation specifications. The CONTROLLER DE-ICING SYS conforms to its applicable AN (Air Force-Navy), MS (Military Standard), or NAS (National Aerospace Standard) specification. Contact us for specific specification details.
Aviation hardware is available in various materials including cadmium-plated steel, stainless steel, aluminum alloy, and titanium depending on the application. Contact us for material certification and specifications for the 4d2037-24.
Yes, we sell hardware in various quantities from single units to bulk lots. The CONTROLLER DE-ICING SYS is available in: As Removed. Submit an RFQ for volume pricing or call (904) 998-9101 for quantity availability.